Preliminary budgets
A low-to-high construction budget with allowances, exclusions, and separately priced options you can walk through with the owner.
Estimating & Preconstruction Consulting
I help general contractors price projects, define trade scopes, and get ready to solicit bids.
Discuss a projectIllustrative estimate
| 01 Base construction | $420k–$490k |
|---|---|
| 02 Covered entry option | +$18k–$24k |
Assumes standard site access.
A low-to-high construction budget with allowances, exclusions, and separately priced options you can walk through with the owner.
Measured quantities and trade scope descriptions you can send out for pricing, with exclusions and the drawing basis identified.
A second set of eyes on drawing changes, scope gaps, and assumptions that could move the number.
Tell me where the project is, what stage the drawings are at, and when you need pricing.
Email Justin justinklosinski@gmail.com